1 |
29-Oct-2024 06:00 PM |
20-Nov-2024 03:00 PM |
21-Nov-2024 03:30 PM |
[Civil works at drill site GKKU in Geleky Area]
[RC1DC24013][2024_ONGC_212880_1]
|
Oil and Natural Gas Corporation Limited||ASSAM ASSET-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
2 |
29-Oct-2024 03:00 PM |
05-Nov-2024 03:00 PM |
06-Nov-2024 03:00 PM |
[Hiring of TPI Agency for inspection of MCC LSP ]
[ZV1HL24001][2024_ONGC_212883_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||MATERIALS GROUP-ONGC |
3 |
29-Oct-2024 03:00 PM |
20-Nov-2024 03:00 PM |
21-Nov-2024 03:30 PM |
[Revamping of Main distribution Panel of Infocom building along with change over panel and associated electrical works]
[BT11C24007][2024_ONGC_212528_1]
|
Oil and Natural Gas Corporation Limited||VADODARA-WON BASIN CWS AND C2-C3 PLANT - ONGC||ELECTRICAL SECTION - ONGC |
4 |
29-Oct-2024 02:00 PM |
18-Nov-2024 03:00 PM |
19-Nov-2024 03:30 PM |
[Supply, Installation, testing and commissioning of Neutral grounding resistor at well sites under CBM Asset, Bokaro]
[wy91c24006][2024_ONGC_212638_1]
|
Oil and Natural Gas Corporation Limited||CBM ASSET BOKARO-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
5 |
28-Oct-2024 06:00 PM |
19-Nov-2024 03:00 PM |
20-Nov-2024 03:30 PM |
[Civil work at drill site GKCB in Geleky Area]
[RC1VC24008][2024_ONGC_212819_1]
|
Oil and Natural Gas Corporation Limited||ASSAM ASSET-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
6 |
28-Oct-2024 04:30 PM |
18-Nov-2024 04:00 PM |
19-Nov-2024 04:00 PM |
[Replacement with rerouting of Off skid or Non OEM parts of Chlorinated Polyvinyl Chloride Pipeline of SHW Galley drain and sewage lines and SHD Living Quarter sewage drain lines of SH Platform]
[YY1NC24012][2024_ONGC_212825_1]
|
Oil and Natural Gas Corporation Limited||MUMBAI- MUMBAI HIGH ASSET-ONGC||SURFACE TEAM - ONGC |
7 |
28-Oct-2024 12:00 PM |
18-Nov-2024 03:00 PM |
19-Nov-2024 03:30 PM |
[SUPPLY INSTALLATION TESTING AND COMMISSIONING SITC OF VRV VRF AIR CONDITIONING SYSTEM ALONG WITH POWER DISTRIBUTION PANEL FOR NEWLY UNDER CONSTRUCTION VIP GUEST HOUSE AT ONGC MEHSANA]
[ET5NC24009][2024_ONGC_212659_1]
|
Oil and Natural Gas Corporation Limited||MEHSANA ASSET-ONGC||HR SECTION - ONGC |
8 |
26-Oct-2024 10:00 AM |
15-Nov-2024 04:00 PM |
18-Nov-2024 04:30 PM |
[Structural audit of three no. water tanks at Nhava Supply Base]
[PCLUC24001][2024_ONGC_212593_1]
|
Oil and Natural Gas Corporation Limited||MUMBAI- OFFSHORE LOGISTICS GROUP-ONGC||OTHERS - ONGC |
9 |
26-Oct-2024 09:00 AM |
16-Nov-2024 03:00 PM |
18-Nov-2024 03:30 PM |
[Replacing of Existing False Flooring System at Main Control Room COGEN Control Room KTI Control Room Gas Terminal Control Room Thermax Boiler Room and Fax Room of Satellite Building in ONGC Hazira Plant Surat]
[8C52C24009][2024_ONGC_212265_1]
|
Oil and Natural Gas Corporation Limited||HAZIRA PLANT - ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
10 |
25-Oct-2024 06:00 PM |
18-Nov-2024 03:00 PM |
19-Nov-2024 03:30 PM |
[Civil works at drill site HPAA in Geleky area]
[RC1VC24007][2024_ONGC_212549_1]
|
Oil and Natural Gas Corporation Limited||ASSAM ASSET-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
11 |
25-Oct-2024 04:00 PM |
18-Nov-2024 04:00 PM |
19-Nov-2024 04:30 PM |
[LSTK project]
[ZW5GC24003][2024_ONGC_212377_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||LOGISTICS AND PRODUCTION GROUP - ONGC |
12 |
25-Oct-2024 02:00 PM |
18-Nov-2024 03:00 PM |
19-Nov-2024 03:30 PM |
[Supply and installation of thermal Insulation on equipments of Drilling Rigs of Mehsana Asset ]
[E16XC24003][2024_ONGC_212560_1]
|
Oil and Natural Gas Corporation Limited||MEHSANA ASSET-ONGC||MEHSANA-MM SECTION - ONGC |
13 |
25-Oct-2024 01:20 PM |
15-Nov-2024 04:00 PM |
18-Nov-2024 03:30 PM |
[Dismantling of unused Light Towers, Requirement of Electrical Lighting Poles and Associated Luminaries related Work at Various Installations Nawagam GGS I, III, Desalter, Ramol GGS and Wasna WIP of Area 2, ONGC Ahmedabad Asset]
[DY1SC24041][2024_ONGC_212551_1]
|
Oil and Natural Gas Corporation Limited||AHMEDABAD ASSET IRS AND WSS - ONGC||SURFACE TEAM - ONGC |
14 |
25-Oct-2024 09:00 AM |
13-Nov-2024 03:00 PM |
14-Nov-2024 03:30 PM |
[Procurement of BPCL make mud pump spares]
[A12SL24001][2024_ONGC_212253_1]
|
Oil and Natural Gas Corporation Limited||ANKLESHWAR ASSET - ONGC||ANKLESHWAR-MM SECTION - ONGC |
15 |
24-Oct-2024 06:00 PM |
14-Nov-2024 03:00 PM |
18-Nov-2024 03:30 PM |
[Civil work at drill site GKKW in Geleky Area]
[RC1DC24012][2024_ONGC_212383_1]
|
Oil and Natural Gas Corporation Limited||ASSAM ASSET-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
16 |
24-Oct-2024 02:00 PM |
13-Nov-2024 03:00 PM |
14-Nov-2024 03:30 PM |
[Hiring of Services for Fabrication of Tube Bundles of Air Heat Exchangers for HP Air Compressors of Balol Main Installation, Mehsana Asset]
[ZV8VC24010][2024_ONGC_212417_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC |
17 |
24-Oct-2024 11:00 AM |
14-Nov-2024 04:00 PM |
18-Nov-2024 04:00 PM |
[Rate Contract for spares of Honeywell Make PLC DCS system.]
[ZW7AS24010][2024_ONGC_212322_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||RC AND EMPANELMENT - ONGC |
18 |
24-Oct-2024 09:00 AM |
13-Nov-2024 03:00 PM |
14-Nov-2024 03:30 PM |
[Supply Installation Testing Commissioning of Separate Express 11 KV feeder for ONGC Mehsana asset Premises from Palavasana substation Gujarat Energy Transmission Company Ltd GETCO Palavasana Village area at ONGC Mehsana Asset]
[ET5NC24008][2024_ONGC_212358_1]
|
Oil and Natural Gas Corporation Limited||MEHSANA ASSET-ONGC||HR SECTION - ONGC |
19 |
23-Oct-2024 04:10 PM |
13-Nov-2024 03:00 PM |
14-Nov-2024 03:00 PM |
[Three Years Rate contract for Electrical works of ONGC, Ahmedabad (2024-2027)]
[DT1KC24002][2024_ONGC_212313_1]
|
Oil and Natural Gas Corporation Limited||AHMEDABAD ASSET IRS AND WSS - ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
20 |
23-Oct-2024 03:00 PM |
08-Nov-2024 11:00 AM |
09-Nov-2024 11:30 AM |
[Hiring of TPI Agency ]
[ZV2YS24005][2024_ONGC_212250_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||MATERIALS GROUP-ONGC |
21 |
23-Oct-2024 02:00 PM |
12-Nov-2024 03:00 PM |
13-Nov-2024 03:00 PM |
[ANNUAL PREVENTIVE MAINTENANCE AND BREAKDOWN MAINTENANCE CONTRACT FOR COOLING APPLIANCES]
[DW2PC24003][2024_ONGC_212221_1]
|
Oil and Natural Gas Corporation Limited||AHMEDABAD ASSET IRS AND WSS - ONGC||WELL SERVICES - ONGC |
22 |
23-Oct-2024 01:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 04:30 PM |
[Rate Contract Supply of Spares of Cameron make Sub-Sea Production System (SPS)]
[ZW7AS24009][2024_ONGC_212143_2]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||RC AND EMPANELMENT - ONGC |
23 |
23-Oct-2024 09:00 AM |
06-Nov-2024 03:00 PM |
07-Nov-2024 03:30 PM |
[TAKING INSURANCE COVER FOR ONGCS HFHSD WHEN IT IS STORED AT ADANI HAZIRA PORT]
[8U2DL24001][2024_ONGC_212199_1]
|
Oil and Natural Gas Corporation Limited||HAZIRA PLANT - ONGC||OTHERS - ONGC |
24 |
22-Oct-2024 06:00 PM |
12-Nov-2024 03:00 PM |
13-Nov-2024 03:30 PM |
[Civil works at drill site HPAC in Geleky area]
[RC1DC24011][2024_ONGC_212141_1]
|
Oil and Natural Gas Corporation Limited||ASSAM ASSET-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
25 |
22-Oct-2024 03:00 PM |
21-Nov-2024 03:00 PM |
22-Nov-2024 03:30 PM |
[Automation of services and procedures through Intranet Portal at Ankleshwar Asset]
[AI1SL24004][2024_ONGC_211865_1]
|
Oil and Natural Gas Corporation Limited||ANKLESHWAR ASSET - ONGC||INFOCOM SECTION - ONGC |
26 |
22-Oct-2024 09:00 AM |
05-Nov-2024 03:00 PM |
06-Nov-2024 03:30 PM |
[HIRING OF TPI AGENCY FOR LSTK WORK FOR REVAMPING OF AKHOLJUNI EPS OF ONGC CAMBAY ASSET]
[C26RL24001][2024_ONGC_211817_1]
|
Oil and Natural Gas Corporation Limited||CAMBAY ASSET-ONGC||CAMBAY-MM SECTION - ONGC |
27 |
21-Oct-2024 06:00 PM |
14-Nov-2024 03:00 PM |
18-Nov-2024 03:30 PM |
[Rate contract of restoration of abandoned drill sites in Ankleshwar Asset for the year 2024-2027]
[AC22C24002][2024_ONGC_212021_1]
|
Oil and Natural Gas Corporation Limited||ANKLESHWAR ASSET - ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
28 |
21-Oct-2024 04:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 04:30 PM |
[REVAMPING OF FACILITY AT SERVICE BUILDING PHASE 2 LT and APFC PANEL ONGC PANVEL]
[1T5RC24018][2024_ONGC_212013_1]
|
Oil and Natural Gas Corporation Limited||MUMBAI- REGIONAL OFFICE AND INSTITUTES-ONGC||ELECTRICAL SECTION-ONGC |
29 |
21-Oct-2024 03:30 PM |
19-Dec-2024 03:00 PM |
20-Dec-2024 03:30 PM |
[GROUP A (Creation of Additional Electrical Facilities for Gomia GCS, Bokaro Asset) and GROUP B (Design, Engineering, Inspection, Supply, Installation, Testing Commissioning of Electrical Substation and associated works at CPF, Gandhar of Ankleshwar]
[ZV8JC24011][2024_ONGC_211785_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||CIVIL AND LSTK ONSHORE GROUP - ONGC |
30 |
21-Oct-2024 12:00 PM |
16-Dec-2024 04:00 PM |
17-Dec-2024 04:30 PM |
[Platform Makeover Project ]
[ZW1MC24001 ][2024_ONGC_211980_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||LSTK GROUP - ONGC |
31 |
19-Oct-2024 11:00 AM |
09-Nov-2024 03:30 PM |
11-Nov-2024 03:30 PM |
[Construction of boundary wall and watch tower at gate no. 3 and gate no. 2 at Panchmukh stores, ONGC Tripura Asset, Agartala]
[TC1AC24003][2024_ONGC_211832_1]
|
Oil and Natural Gas Corporation Limited||DELHI- MM COORDINATION AND OTHERS-ONGC||INFRASTRCTURE GROUP - ONGC |
32 |
18-Oct-2024 04:00 PM |
07-Nov-2024 03:00 PM |
08-Nov-2024 03:30 PM |
[Intelligent Pigging]
[ZV8RC24009][2024_ONGC_211702_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC |
33 |
18-Oct-2024 03:00 PM |
08-Nov-2024 03:00 PM |
11-Nov-2024 11:00 AM |
[Relocation of Main Gate at ONGC Colony, Chennai]
[MC5SC24003][2024_ONGC_211697_1]
|
Oil and Natural Gas Corporation Limited||CHENNAI REGIONAL OFFICE AND CAUVERY BASIN-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
34 |
18-Oct-2024 03:00 PM |
08-Nov-2024 03:00 PM |
11-Nov-2024 03:30 PM |
[Facelifting and renovation of Swarna Jayanthi Munch auditorium at ONGC Colony Karaikal Civil and Electrical]
[VC1CC24024 ][2024_ONGC_211661_1]
|
Oil and Natural Gas Corporation Limited||CAUVERY ASSET KARAIKAL-ONGC||ENGINEERING SERVICES AND CIVIL-ONGC |
35 |
18-Oct-2024 09:00 AM |
07-Nov-2024 04:00 PM |
08-Nov-2024 04:30 PM |
[Roof repair of T 201B]
[UP1AC24004][2024_ONGC_211672_1]
|
Oil and Natural Gas Corporation Limited||URAN PLANT - ONGC||ERG - ONGC |
36 |
17-Oct-2024 03:00 PM |
07-Nov-2024 03:00 PM |
08-Nov-2024 03:30 PM |
[Fire Proof Coating of Legs of LPG Spheres at CPF-GDR of Ankleshwar Asset]
[ay1ac24028][2024_ONGC_211665_1]
|
Oil and Natural Gas Corporation Limited||ANKLESHWAR ASSET - ONGC||SURFACE TEAM - ONGC |
37 |
16-Oct-2024 04:00 PM |
07-Nov-2024 03:00 PM |
08-Nov-2024 04:00 PM |
[Supply, Installation, Commissioning and Replacement of NI-CD Battery Banks for TG-1 and BC-1B battery banks installed at IC complex of MH Asset]
[YY14C24002][2024_ONGC_211423_1]
|
Oil and Natural Gas Corporation Limited||MUMBAI- MUMBAI HIGH ASSET-ONGC||SURFACE TEAM - ONGC |
38 |
16-Oct-2024 03:00 PM |
05-Nov-2024 03:00 PM |
06-Nov-2024 03:00 PM |
[Hiring of TPI Agency for Industrial Painting]
[LZ1SL24002][2024_ONGC_210332_1]
|
Oil and Natural Gas Corporation Limited||JORHAT ASSET AND BASIN-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
39 |
16-Oct-2024 03:00 PM |
06-Nov-2024 03:00 PM |
07-Nov-2024 03:30 PM |
[Misc. civil works 2024 at KDM complex, Jodhpur and Jaisalmer Guest House]
[GC5SC24008 ][2024_ONGC_207981_2]
|
Oil and Natural Gas Corporation Limited||RKOEA JODHPUR - ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
40 |
15-Oct-2024 06:00 PM |
30-Oct-2024 06:00 PM |
01-Nov-2024 02:00 PM |
[Supply and installation of 07 Nos. Lockout Relays at NQO HT Panels (6.6KV).]
[YY1VL24036][2024_ONGC_211440_1]
|
Oil and Natural Gas Corporation Limited||MUMBAI- MUMBAI HIGH ASSET-ONGC||MAINTENANCE TEAM-ONGC |
41 |
15-Oct-2024 06:00 PM |
05-Nov-2024 02:00 PM |
06-Nov-2024 03:30 PM |
[Supply, Installation and Commissioning of Chemical Injection Skids at Sanand GGS 1 of ONGC Ahmedabad Asset]
[DY1HC24001][2024_ONGC_211343_1]
|
Oil and Natural Gas Corporation Limited||AHMEDABAD ASSET IRS AND WSS - ONGC||SURFACE TEAM - ONGC |
42 |
15-Oct-2024 12:40 PM |
25-Nov-2024 03:00 PM |
26-Nov-2024 03:30 PM |
[As Built Virtual Tour for SHP and Heera Process Complex using 3D laser survey along with 3 years of AMC on LSTK basis ]
[ZV7PC24008][2024_ONGC_211330_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||DIGITAL AND IT GROUP - ONGC |
43 |
14-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 04:30 PM |
[Repair of Feeder Pillars at Phase 1 and 2 ONGC Complex Panvel]
[1T5RC24017][2024_ONGC_208494_2]
|
Oil and Natural Gas Corporation Limited||MUMBAI- REGIONAL OFFICE AND INSTITUTES-ONGC||ELECTRICAL SECTION-ONGC |
44 |
10-Oct-2024 06:30 PM |
01-Nov-2024 03:00 PM |
04-Nov-2024 03:30 PM |
[CONSTRUCTION OF BTSAH DRILL SITE ]
[KC2WC24003][2024_ONGC_210974_1]
|
Oil and Natural Gas Corporation Limited||RAJAHMUNDRY ASSET-ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
45 |
10-Oct-2024 03:10 PM |
12-Nov-2024 03:00 PM |
13-Nov-2024 03:30 PM |
[RATE CONTRACT FOR REPAIR AND FABRICATION JOBS IN CAUVERY ]
[VE1NC24005][2024_ONGC_210783_1]
|
Oil and Natural Gas Corporation Limited||CAUVERY ASSET KARAIKAL-ONGC||OTHERS - ONGC |
46 |
10-Oct-2024 12:15 PM |
18-Nov-2024 04:00 PM |
19-Nov-2024 04:30 PM |
[Empanelment of Fabrication Agency for Topside Fabrication of Well Head Platforms for Western Offshore Projects ]
[ZW1GC24002][2024_ONGC_210981_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||LSTK GROUP - ONGC |
47 |
09-Oct-2024 12:00 PM |
30-Oct-2024 03:00 PM |
01-Nov-2024 03:30 PM |
[Rate Contract for Cleaning, Hydro testing and Certification of Pressure Vessels, Heater Treater and Bath Heaters of Assam Asset for 5 years]
[ZV8JC24010][2024_ONGC_210824_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||CIVIL AND LSTK ONSHORE GROUP - ONGC |
48 |
09-Oct-2024 09:00 AM |
30-Oct-2024 03:00 PM |
01-Nov-2024 03:30 PM |
[Construction of RCC building for shopping complex cum Cafeteria at residential colony Cauvery Asset Karaikal CIVIL and ELECTRICAL]
[VC1CC24022][2024_ONGC_210791_1]
|
Oil and Natural Gas Corporation Limited||CAUVERY ASSET KARAIKAL-ONGC||ENGINEERING SERVICES AND CIVIL-ONGC |
49 |
08-Oct-2024 06:00 PM |
30-Oct-2024 03:00 PM |
01-Nov-2024 03:30 PM |
[Revamping and facelift of compound wall at ONGC Neravy Office complex Karaikal Civil and Electrical works]
[VC1CC24023][2024_ONGC_210731_1]
|
Oil and Natural Gas Corporation Limited||CAUVERY ASSET KARAIKAL-ONGC||ENGINEERING SERVICES AND CIVIL-ONGC |
50 |
08-Oct-2024 02:00 PM |
08-Nov-2024 02:00 PM |
11-Nov-2024 10:00 AM |
[Revamping of existing power panels Power cables and PDBs installed in kitchen at Neelam Platform including Installation of new Kitchen Equipment in Galley by removing the old equipment including testing and commissioning. ]
[NY1AC24021][2024_ONGC_210455_1]
|
Oil and Natural Gas Corporation Limited||MUMBAI- NEELAM AND HEERA ASSET-ONGC||MAINTENANCE TEAM-ONGC |
51 |
08-Oct-2024 11:00 AM |
18-Nov-2024 03:00 PM |
19-Nov-2024 03:30 PM |
[Rate Contract for Repair and Maintenance of GRP/GRE pipelines in Ankleshwar Asset for the period of Three Years (2025-28)]
[AA1MC24001][2024_ONGC_210312_1]
|
Oil and Natural Gas Corporation Limited||ANKLESHWAR ASSET - ONGC||ENGINEERING SERVICES AND CIVIL - ONGC |
52 |
05-Oct-2024 10:00 AM |
05-Nov-2024 04:00 PM |
06-Nov-2024 04:30 PM |
[OPENING OF WINDOW FOR EMPANELMENT OF VENDORS FOR HIRING OF O AND M SERVICES FOR DRILLING RIGS]
[ZW4SS24002][2024_ONGC_210234_2]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||DRILLING AND WELL SERVICES GROUP - ONGC |
53 |
04-Oct-2024 03:30 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 04:00 PM |
[Rate Contract with ABB India Ltd. Bengaluru for supply of spares]
[ZW7AS24008][2024_ONGC_210205_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||RC AND EMPANELMENT - ONGC |
54 |
04-Oct-2024 09:00 AM |
04-Dec-2024 03:00 PM |
05-Dec-2024 03:30 PM |
[ Industrial Maintenance Painting of all the installations of Ankleshwar Asset]
[ZV8VC24009][2024_ONGC_210182_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC |
55 |
02-Oct-2024 02:00 PM |
11-Nov-2024 03:00 PM |
12-Nov-2024 03:30 PM |
[Rate Contract for Tentage services for official functions meeting and events at ONGC Vadodara for 03 Years]
[B26SC24003][2024_ONGC_209992_1]
|
Oil and Natural Gas Corporation Limited||VADODARA-WON BASIN CWS AND C2-C3 PLANT - ONGC||VADODARA-MM SECTION - ONGC |
56 |
30-Sep-2024 02:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 04:00 PM |
[Rate Contract for supply of Spares for Elecon make Gear Boxes]
[ZW7AS24007][2024_ONGC_209783_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||RC AND EMPANELMENT - ONGC |
57 |
27-Sep-2024 01:00 PM |
08-Nov-2024 04:00 PM |
11-Nov-2024 04:00 PM |
[Rate Contract for supply of Spares for Elecon make Gear Boxes.]
[ZW7AS24005][2024_ONGC_209573_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||RC AND EMPANELMENT - ONGC |
58 |
24-Sep-2024 11:00 AM |
26-Nov-2024 04:00 PM |
27-Nov-2024 04:30 PM |
[Integrated Development of Chandrika and GS49 Project]
[ZW2PC24002][2024_ONGC_209131_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||LSTK GROUP - ONGC |
59 |
21-Sep-2024 09:00 AM |
11-Nov-2024 03:00 PM |
12-Nov-2024 03:30 PM |
[Implementation of Offshore Logistics Management Solution]
[ZV7AC24008][2024_ONGC_208843_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||DIGITAL AND IT GROUP - ONGC |
60 |
20-Sep-2024 05:30 PM |
25-Nov-2024 04:00 PM |
26-Nov-2024 04:30 PM |
[Subsea Production System]
[ZW1PC24004][2024_ONGC_208785_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||LSTK GROUP - ONGC |
61 |
19-Sep-2024 01:00 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 04:30 PM |
[LSTK for Supply, Installation and Commissioning of two MIP Packages at SHW platform of MH Asset]
[ZW1AC24002][2024_ONGC_208627_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||LSTK GROUP - ONGC |
62 |
13-Sep-2024 04:00 PM |
05-Nov-2024 03:00 PM |
06-Nov-2024 03:30 PM |
[Setting up of Solar PV Car Parking facility with EV Charging Points at ONGC KDM Complex Mehsana along with Operation and Maintenance for Seven years.]
[ZV8JC24009][2024_ONGC_208278_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||CIVIL AND LSTK ONSHORE GROUP - ONGC |
63 |
13-Sep-2024 04:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 04:30 PM |
[PROCUREMENT OF MUD LINE SUSPENSION SYSTEM ALONG WITH ASSOCIATED TOOLS AND SERVICES ON CALL OUT BASIS FOR 3 YEARS]
[ZW3NC24001][2024_ONGC_208118_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||DRILLING AND WELL SERVICES GROUP - ONGC |
64 |
13-Sep-2024 09:00 AM |
19-Nov-2024 03:00 PM |
20-Nov-2024 03:30 PM |
[SITC of AV and VC System along with 4 years post warranty CAMC for Six work centers of ONGC on LSTK basis ]
[ZV7GC24001][2024_ONGC_208112_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||DIGITAL AND IT GROUP - ONGC |
65 |
11-Sep-2024 02:00 PM |
29-Nov-2024 03:00 PM |
02-Dec-2024 03:30 PM |
[Supply, Installation and Commissioning of CCTV]
[ZV7AC24007][2024_ONGC_207843_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||DIGITAL AND IT GROUP - ONGC |
66 |
05-Sep-2024 06:00 PM |
18-Nov-2024 03:00 PM |
19-Nov-2024 03:30 PM |
[PROCUREMENT OF HFHSD FOR A PERIOD OF 03 YEARS]
[ZV1AC24001][2024_ONGC_207321_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||MATERIALS GROUP-ONGC |
67 |
31-Aug-2024 11:00 AM |
07-Nov-2024 04:00 PM |
08-Nov-2024 04:30 PM |
[Repair of leg bracings structure of Vessel (Offshore Drilling Jack-up Rig) Sagar Gaurav on LSTK basis]
[ZW1NC24001][2024_ONGC_206450_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||LSTK GROUP - ONGC |
68 |
30-Aug-2024 05:10 PM |
07-Nov-2024 03:00 PM |
08-Nov-2024 03:30 PM |
[Data Acquisition and Monitoring System (DAMS) along with field ]
[ZV9AC24005][2024_ONGC_206609_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||CIVIL AND LSTK ONSHORE GROUP - ONGC |
69 |
12-Aug-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 03:30 PM |
[Construction of Groynes for Coastal Protection near ONGC Pipeline and Plant Area at Odalarevu Village, Dr. B.R. Ambedkar Konaseema District, Andhra Pradesh]
[ZV9SC24008][2024_ONGC_204632_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC |
70 |
12-Aug-2024 03:15 PM |
26-Nov-2024 03:00 PM |
27-Nov-2024 03:30 PM |
[Setting up of Captive ISTSConnected Colocated Wind Solar Hybrid Power Projects with a Capacity 1000MW (500MW Solar plus 500MW Wind) On Lumpsum Turnkey (LSTK) Basis anywhere in India with Comprehensive Operation and Maintenance for Ten (10) Years]
[ZV8JC24007][2024_ONGC_204609_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||CIVIL AND LSTK ONSHORE GROUP - ONGC |
71 |
05-Aug-2024 05:00 PM |
31-Oct-2024 04:00 PM |
01-Nov-2024 04:00 PM |
[Hiring of services for Operation and Maintenance contract for CPP LQUP of Eastern Offshore Asset EOA Kakinada for 03 years]
[ZW6TL24002][2024_ONGC_203564_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||LOGISTICS AND PRODUCTION GROUP - ONGC |
72 |
05-Aug-2024 04:30 PM |
08-Nov-2024 03:00 PM |
11-Nov-2024 03:30 PM |
[SIC of IP based surveillance cameras along with Power and Communications Setup at 15 unmanned WHPs of Mumbai Offshore ]
[ZV7PC24006][2024_ONGC_203782_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||DIGITAL AND IT GROUP - ONGC |
73 |
10-Jul-2024 12:15 PM |
22-Nov-2024 03:00 PM |
23-Nov-2024 03:00 PM |
[Procurement of 23 nos of High Pressure Cementing Units with AMC for 6 years and 10 nos of Batch Mixer]
[ZV3SC24002][2024_ONGC_200864_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||MATERIALS GROUP-ONGC |
74 |
20-Jun-2024 03:30 PM |
14-Nov-2024 03:00 PM |
18-Nov-2024 03:30 PM |
[PROCUREMENT OF HSD FOR ONSHORE ASSETS/BASINS FOR PERIOD OF 03 YEARS]
[ZV4PC24001][2024_ONGC_198656_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||MATERIALS GROUP-ONGC |
75 |
03-Jun-2024 06:00 PM |
19-Dec-2024 04:00 PM |
20-Dec-2024 04:30 PM |
[Rate Contract for supply of spares for Allison Transmission System for 3 years]
[ZW7SS24001][2024_ONGC_197044_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||RC AND EMPANELMENT - ONGC |
76 |
01-Jun-2024 01:00 PM |
02-Dec-2024 03:00 PM |
03-Dec-2024 03:30 PM |
[Engagement of Technical Services Provider (TSP) for Mumbai High (MH) Field]
[ZV9JC24002][2024_ONGC_197086_1]
|
Oil and Natural Gas Corporation Limited||Central Procurement Department - ONGC||CIVIL AND LSTK ONSHORE GROUP - ONGC |